Sunday, June 10, 2012

On the road again


This was the second consecutive weekend of working on the car again after the long bathroom remodel hiatus. There were a number of Gilligan's Island three hour tours, finishing up reinstalling the radiator, replacing the power steering reservoir with one that the hood can close over, securing the 5.3L truck fuel rails on the LS1 intake, and even replacing the battery - new optima has a different top than the old one.

One successful modification was rev 2.0 of the transmission shift linkage arm. This has been done for months, but the dead battery restricted testing. Mutt successfully traversed from the lift to the driveway, engaged park for a well needed interior vacuum, and moved back to the lift under it's own power.

The power steering reservoir was a rev 3.0 - the original bracket for the old LT1 reservoir that ended up not fitting, then rev 2.0 and 2.5 for the new one prior to installing hoses, and a final rev 3.0 with the hosed installed. Fortunately, it's a simple bracket from a piece of .090 gauge aluminum with four holes and a couple mild bends.

The next fabrication is for the air intake. I've been struggling with that one - how to make the transition from one side of the radiator support to the other - with the larger track to the new LS MAF,  the tubing is too close to the radiator to use a nice manderal bend. The solution looks to be to make a nice box for the transition with a tubular inlet, a radiused corner across from the inlet, and a transition on the adjacent side to a tubular exit. I'll fab it up this week and get someone to weld it up for me to solve this dillema.

Monday, June 4, 2012

Bathroom 1, Corvette 0

Between a home bathroom remodel, a trip to China, and a ten day trip to the bay area, the Corvette was neglected for ten weeks. I'm happy to report that Susan and I are very pleased with the bath remodel, and the garage picked up a nice big subpanel and lost the washer and dryer. Can't complain about more power and more space to work, and Susan won't bump into the lift doing laundry anymore.

At this point it was time to start doing some time / money tradeoffs on unsuccessful fabrication efforts. The first was reuse of the 1993 Corvette LT1 dual fan setup. I had tried to make a new aluminum shroud to accomodate the fans and clear the larger 4" air intake for the LS motor. That project was doomed from the moment it put the first blemish in the new paint.


The fan is a 16" Spal with the Be-Cool rebranding mark-up for the included hardware kit. A set of universal brackets mount it to the radiator.

Universal brackets are, well, universal. In addition to trimming off the ears at the fan on all the brackets, this bracket required a notch to clear the mounting pin for the radiator.

The project was a success, with an inch of clearance around the air intake once I rotate the offending hose clamp.
Posted by Picasa

Sunday, January 8, 2012

Back at it

It seems like September, October and November got away from me with a couple trips to China, a family reunion, some ministry work, a kitchen peninsula range hood install, and a backyard landscaping project. Thanksgiving I took the week off, but with a couple visitors over that week, I only got a few hours in on the project. Christmas I took two weeks off work, with a goal of getting back to work on the car.

Back in August I was struggling with power steering routing, and had a few other things that seemed like giant conundrums. Every project seems to have some of those. With a few months away, and several days to work through things, managed to get back to making forward progress. Power steering is now plumbed, heater box is reinforced and back in the car, and a host of other small tasks knocked off the to do list. Of course, for every couple of steps forward, there's a step back.

Friday, January 6th, the car made it's first movement under it's own power, only to find that park wasn't fully engaging - looks like the shifter linkage lever I built needs revision. I should have figured that one out when the car wouldn't start in park. Of course, the ebrake wasn't installed yet, so it was a quick run up and down the driveway, just long enough to turn the car around to have proof it actually moved. Ebrake is now installed, but there's a few more things to knock off before the true maiden run of the car - then lots of little stuff including windows, interior, and exterior trim before it's done. God willing, it will see the road this spring.

Sunday, August 14, 2011

4 hours

Some time ago I made a number of business trips to Japan, and it seemed every customer we visited, it took us three hours to get there, whether taking subway in Tokyo, taking the bullet train out to the customer, or driving with our local manufacturer's rep.

Lately, it seems like everything on the corvette is taking four hours. Gas pedal has an S-Bend right into the trans tunnel. Build a new arm out of 1/4" steel  for the pedal that bends to the left rather than the right - you've got it - four hours.

Arm for the shifter on the transmission is shorter than the one that I had with the 93 Corvette shifter I'm using, but the one from the 93 corvette hits the exhaust pipe. Time to make a new one out of some 3/16" steel. Needs a square hole on one end and an oval hole on the other. Don't know about you, but my drill bits only make round holes, and I don't have a mill.

New wiper transmissions for the new wiper system replacing the old cable system. Brackets rub against the windshield channel - some filing to make clearance. Well, I'm not four hours into it, but I'm hardly started on this one.

New location for the power steering reservoir - well that bracket was easier to fabricate, and I only got it wrong and had to redo half of it, so it was probably only 90 minutes.

New Aluminum master cylinder - fittings were different than the old iron master, so tried re-flaring in place, ended up fabricating two new lines to the first tee or junction. Probably only 2 hours all said and done.

So not everything is taking four hours, but it all takes time. Looked at my checklist from last weekend. Crossed two things off the list of 22 must do things before I pull the car into the driveway under it's own power, but put four more things on the list, so I've now got 24 things left to do.

Not depressed, just struggling to accept the reality of how many little details there are when building a car from the ground up.

Tuesday, July 19, 2011

Brakes

Now that the car starts, time to get other critical mechanical systems together. Cleaned and painted the front calipers and rebuilt them using the AC Delco seal kit. Pretty easy to rebuild - just slightly more involved than a drum brake cylinder.

Was going to get a fresh master cylinder, but didn't know what Newman Car Creations used. Contacted them, and found it was a booster system put together by Vanco Power Brakes, but then Paul contacted me, and said he had one last Aluminum master cylinder from the second design they produced, so Newman is shipping that off to me to replace the cast iron master cylinder.
Posted by Picasa

Saturday, July 16, 2011

Vroom, vroom

Well, missed the goal by a week, but I'm still happy. I think a ground wire did me in. I also had a burr on the crossover on the fuel rail causing a leak, and a fuel regulator that wasn't at 58 psi.Once I fired it, found the serpentine belt was jumping around - not enough tension, so I swapped the 75mm idler pulley for a 100mm pulley I had sitting on the shelf.

http://www.youtube.com/watch?v=jOjuTW1VA5s

In my frustration over the engine, I put the spears and emblems on the coves. Turns out the driver emblem placement wasn't straight on the replacement panel, so had to add new holes - luckily the wrong holes stayed behind the emblems.

Saturday, July 9, 2011

Didn't get my birthday wish

Had hoped to start the engine today. Got close, but no cigar.

Many minor inconveniences along the way today. Power steering pressure line hit the suspension cradle, so I had to straighten it out and rebend it.

Starter install was challenging with the bat wing pan. Needed to drop it in from the top, pull the dip stick, and wiggle it in place.

Oil line to the gauge ended up two inches too short due to the fitting being near the pan rather than the top of the block, so required a trip to the store for a union.

Got the front dress on, and the belt ended up too long. The tensioner bracket has two positions, but the one that would have taken up the slack hit the steering rack. Trip number two to the parts store, to get a couple smaller belts and a bigger idler pulley. Came up empty on the pulley, but got a belt an inch smaller, and one three inches smaller. Both were too small. Time to pull the tensioner bracket for a second time today, and redrill it to move the tensioner.

After getting the wiring done, the tranny cooler line looped, the starter installed and  the front dress on the engine,  turned the key and had no fuel pump activation, and no PCM through the OBD-II port. Bypassed the relay and found several fuel leaks. Need to check one flare tomorrow that I can't seem to get to seal, and figure out why the gauge isn't reading any pressure, since it's the return line that's the last one leaking. Then it's time to debug the PCM wiring and see what I missed. So close I can smell it. Or was that all the gas I spilled? ;-)